Infrastructure & Policy

Kaliabe Journal

National systems made visible. Notes on Nigeria's compliance landscape, sovereign data infrastructure and the institutions that keep the record.

  1. From a flare estimate to a compute project

    A developer should establish usable gas supply and the intended workload before proposing computing capacity. A framework for the evidence needed before a pilot.

  2. Buying Nigerian cloud requires evidence for the whole service

    Institutions should assess data flows and recovery tests for the service they plan to buy. A location label alone does not establish its compliance.

  3. The carbon credit opportunity in Nigeria

    Nigeria's Carbon Market Activation Policy targets 2.5 billion dollars of carbon credit investment by 2030. Which sectors can actually issue, who owns the credit, and the three gaps that decide who wins: verification, corresponding adjustments, and market plumbing.

  4. Path to Green White Green - Article Eight

    A planning calendar for the 1 January 2027 CBN data localisation deadline. October register timing remains unverified. CSAT submission was due weeks after the March 2026 circular.

  5. Path to Green White Green - Article Seven

    The October 2026 register timing was a prior projection and remains unverified. The published NITDA guideline states an effective date of 1 January 2027. Evidence to request before choosing a cloud provider.

  6. Path to Green White Green - Article Six

    The three-environment model: onshore primary, onshore DR, offshore. Two boundaries, the replication path, workload placement and the latency trap. A playbook for a topology that works.

  7. Path to Green White Green - Article Five

    84% of Nigeria's data centre capacity sits in one city. A Lagos-only onshore strategy replicates the single-region risk the hyperscalers eliminated. The migration plan needs a second site.

  8. Path to Green White Green - Article Four

    Four layers (identity, networking, deployment, monitoring) must be designed before the first workload moves. The control plane takes three to four weeks with two engineers. Do not start migrating until it is set up and tested.

  9. Path to Green White Green - Article Three

    The hardest design decision in a data localisation is deciding what to move. Three categories, a four-step classification process, four common mistakes, and what a complete classification looks like.

  10. Path to Green White Green - Article Two

    Who in Nigeria's payments ecosystem is most exposed to the January 2027 deadline: banks carry scale and legacy, fintechs carry volume and concentration risk, and the talent gap underneath everything is the real bottleneck.

  11. Path to Green White Green - Article One

    The CBN data residency deadline of January 2027 makes a national operating condition explicit: the payment record of Nigeria will be held in Nigeria. What the circular requires, and why sovereign data infrastructure is the compliance answer.